2026 Los Angeles Home Remodel Permit Report

A remodel in Los Angeles usually means a new roof, a kitchen, a bathroom, a set of windows or a seismic retrofit. Each is filed as an alteration or repair permit, and the City records every one with a description of the work.

We took every alteration and repair permit the City has issued on a single-family house since January 2020, removed revisions, renewals, ADU work and repeat permits, and sorted the remaining 120,994 permits by the kind of work they list. Of the permits issued from January to October 31, 2026, re-roofs are 54.0%, the highest share of the seven years. Kitchen and seismic retrofit permits are at their lowest of the seven years.

This report publishes the figures and the dataset. It does not argue for a cause. Where a number invites one, the competing readings are listed and left open.

The Dataset

  • Source: City of Los Angeles open data, dataset pi9x-tg5x, Building and Safety permits issued from 2020 to present. Public, with permits issued through November 21, 2026.
  • Unit: an alteration or repair permit on a single-family house, sorted by the kinds of work its description lists. One permit can list several, such as a kitchen and two bathrooms, so the kinds overlap and do not add up to the total.
  • Removed: 28,859 revisions of earlier permits, 187 renewals of expired permits, 6,090 permits that create or convert an accessory dwelling unit, and 5,468 repeat permits for the same kind of work on the same parcel within 180 days.
  • Matched windows. Every year is cut to January 1 – October 31, so 2026 is compared like-for-like.
  • These are permits, not finished work, and work done without a permit is not in the record.

Permits are issued by the Los Angeles Department of Building and Safety.

Finding 1: Re-Roofs Are 54% of House Remodel Permits, the Highest Share in Seven Years of Data

From January 1 to October 31, the City issued 8,546 re-roof permits on single-family houses, 23.4% more than in 2025 and second only to 2023's 8,635. They are 54.0% of all remodel permits this year, up from 46.4% in 2025 and 44.1% in 2020.

2020
5,430 · 44.1% of remodel permits
2021
5,514 · 41.0% of remodel permits
2022
6,383 · 44.1% of remodel permits
2023
8,635 · 52.6% of remodel permits
2024
8,522 · 50.0% of remodel permits
2025
6,928 · 46.4% of remodel permits
2026
8,546 · 54.0% of remodel permits

Re-roof permits on single-family houses, issued January 1 – October 31 of each year, and their share of all remodel permits in the same months.

September 2026 (1,211) and October 2026 (1,262) are the two busiest months for re-roof permits since January 2020. The previous high was October 2023, with 1,127. October was the busiest month in five of the seven years, counting 2026 to October.

03507001,0501,4002020202120222023202420252026Sep 1,211 · Oct 1,262

Re-roof permits on single-family houses issued each month, January 2020 to October 2026. Revisions and same-parcel repeats removed.

The size of a typical re-roof has not changed. Where the permit states it, the median roof is 23 squares, about 2,300 square feet of roof, and it has been 22 or 23 squares every year. The share laid over new sheathing rather than the existing roof deck has fallen from 25.5% in 2020 to 18.3% in 2026.

Finding 2: Permits Without a Re-Roof Fell 9%

Take the re-roofs out and remodel permits fell from 8,013 to 7,271 this year, 9.3% fewer and the lowest since 2020, when it was 6,875. Kitchen work appears on 1,608 permits, the fewest of the seven years. Window and door work fell 4.5%, to 2,180, and bathroom work 7.0%, to 2,338.

YearWithout a re-roofKitchen workWindows or doors
20206,8751,7692,405
20217,9282,2272,743
20228,0812,2072,623
20237,7871,7142,265
20248,5071,8722,406
20258,0131,6762,283
20267,2711,6082,180

Remodel permits on single-family houses issued January 1 – October 31 of each year. A permit can include kitchen work and windows, so the columns overlap.

Finding 3: Kitchen Remodels Through Plan Check Fell by More Than Half Since 2021

The City's Express Permit for a kitchen describes a remodel with "no changes in walls or openings" or "no structural changes", in its own wording, and is issued without plan review. The rest of the kitchen permits went through plan check. Kitchen permits through plan check fell from 611 in 2021 to 290 in 2026, 53% fewer, and from 27.7% of kitchen permits in 2023 to 18.0%, the lowest share of the seven years.

YearKitchen permitsThrough plan checkShare
20201,76943524.6%
20212,22761127.4%
20222,20759326.9%
20231,71447427.7%
20241,87244423.7%
20251,67634220.4%
20261,60829018.0%

Permits on single-family houses that include kitchen work, issued January 1 – October 31 of each year.

Finding 4: Seismic Retrofit Permits Fell 37%

The City issued 1,053 seismic retrofit permits on single-family houses from January 1 to October 31, against 1,667 a year earlier, a fall of 36.8% and the lowest of the seven years. More than 97% in every year use the City's standard plan for bolting a house to its foundation and bracing the short cripple walls under it with plywood. The monthly count fell from between 126 and 228 a month in 2025 to 39 in May 2026, the lowest month since January 2020, and stood at 165 in October 2026.

2020
1,352
2021
1,221
2022
1,406
2023
1,563
2024
1,943
2025
1,667
2026
1,053

Seismic retrofit permits on single-family houses, issued January 1 – October 31 of each year.

We checked whether the work had simply moved to another kind of permit. Counted across every permit type and building use, the standard plan's wording also fell, by 35.9%. Retrofits are most common, as a share of remodel permits, in Palms – Mar Vista – Del Rey (16.2%), Van Nuys – North Sherman Oaks (15.7%) and West Adams – Baldwin Hills – Leimert (15.7%).

Finding 5: Nearly Nine in Ten Remodel Permits Skip Plan Review

Since 2023, 87.7% of remodel permits on single-family houses were Express Permits, issued without plan review. That ranges from 99.5% of re-roofs to 77.6% of permits with kitchen work. For the 9,029 that went through plan check, the median from application to issue was 27 days.

Kind of workIssued without plan reviewPlan check, median daysPlan check, middle half
Kitchen77.6%287–70 days
Bathroom78.6%236–67 days
Windows or doors81.0%274–76 days
Seismic retrofit94.7%90–29 days
Fire-damage repair44.3%4718–103 days
All remodel permits87.7%275–77 days

Remodel permits on single-family houses issued from January 2023 to November 21, 2026. Permits that create or convert an ADU, almost all plan-checked, are excluded. Express Permits carry no application date, so the day counts cover plan-checked permits only. They include time the application spends with the applicant, and only permits that were issued are counted.

Finding 6: Roofs Lead in the North Valley and Harbor, Kitchens and Baths in Central LA and the Westside

Since 2023, re-roofs are 58.2% of remodel permits in the North Valley and 58.1% in the Harbor area, against 43.0% in West Los Angeles. Kitchen and bathroom work run the other way: kitchens are 13.0% of permits in Central Los Angeles and 11.7% in West Los Angeles, against 7.4% in the Harbor area, and bathrooms 17.4% and 16.9%, against 10.0%.

Community plan area, since January 2023Remodel permitsRe-roof shareKitchen share
Arleta – Pacoima1,01865.3%7.1%
Wilmington – Harbor City75265.0%6.9%
Sylmar95064.4%7.4%
Sun Valley – La Tuna Canyon1,29060.9%10.3%
Southeast Los Angeles1,58660.1%10.7%
Bel Air – Beverly Crest1,58543.3%14.8%
Hollywood3,87143.1%14.2%
Westwood62043.1%13.4%
Brentwood – Pacific Palisades2,77939.8%12.6%
West Los Angeles – Century City – Rancho Park1,71846.6%12.3%

The five areas with the highest re-roof share, then the five with the highest kitchen share, of the 32 areas with at least 300 remodel permits since 2023. All areas are in the area CSV below.

Finding 7: 246 Fire-Damage Repair Permits Since 2025, a Third in the Palisades

Permits to repair fire damage to a house ran at 61 to 89 a year from January to October 31 between 2020 and 2024. They reached 125 in 2025, the most of the seven years, and 101 in 2026. Of the 246 issued since January 2025, 79 (32.1%) are in Brentwood – Pacific Palisades. Houses rebuilt after the fire are almost all filed as new-house permits, outside this report, and other work that only carries the City's "2025 wildfire" eligibility label is not counted as a repair.

Possible Readings

  • The rise in re-roofs fits several explanations: older roofs reaching the end of their life, damage from wet winters, insurers asking about roof age or condition, or owners timing the work before the rainy season, which would match the autumn peaks. The permit carries none of those, so it cannot separate them.
  • The fall in kitchen and plan-checked work fits higher borrowing costs, owners spending on necessary repairs before improvements, or work done without a permit. Additions of living space fell this year too (see our Home Addition Report). The record does not separate these.
  • The seismic drop could reflect the timing of grant programs such as the state's Earthquake Brace + Bolt, fewer eligible older houses left unretrofitted, or contractors busy with roofs and the fire rebuild. None of those is recorded on the permit.
  • Roofs in the Valley, kitchens on the Westside may follow the age and construction of the housing, house values, or roof types. The permit does not record the age of the house.

Opportunity Spotlight

  • Roof work bunches in autumn. September 2026 and October 2026 set records for re-roof permits. Filing earlier in the year avoids the busiest permit months.
  • The City's Express Permit covers a kitchen remodel with no changes in walls or openings, with no plan review. Kitchen permits that went through plan check took, a median of 28 days to issue, and the slowest quarter 70 days or more.
  • Seismic retrofit permits are at their lowest of the seven years, and 94.7% of them are issued without plan review.
  • Kitchen and bathroom work make up the largest shares of remodel permits in Central LA and on the Westside.

Method

  • Revisions. A supplemental permit revises an earlier one: an original's middle block ends in 0000 and a revision counts up from it. Revisions numbered as originals but described as supplemental are removed as well. This matters for fire damage: most "2025 wildfire" wording in this category sits on revisions of earlier Palisades permits, not on repairs.
  • Fire-damage repairs need explicit damage or repair wording. The City's "2025 wildfire project" label, eligible or ineligible, goes on any permit at a fire-area property, including bathroom remodels and foundation upgrades, so the label alone does not count.
  • Kinds of work are read from the description. Re-roofs include tile resets. A roof coating or roof framing on its own does not count. Seismic retrofits are foundation bolting, cripple-wall bracing and other retrofit wording, but not chimney repairs or gas shut-off valves. Bathrooms include powder rooms and showers, and common misspellings of kitchen are caught. Combined Express Permits list several jobs in one text, so the whole text is searched.
  • Hand checks. Forty random permits per kind of work, issued since 2023 and drawn in two separate samples, were read in full: 40 of 40 correct for re-roofs, 39 of 40 correct for kitchens, 40 of 40 correct for bathrooms, 39 of 40 correct for windows and doors, 40 of 40 correct for seismic retrofits, 40 of 40 correct for fire-damage repairs.
  • The fire hazard zone sentence on re-roof permits is standard text, stating where a Class A roof is required. It does not say where the house is, and no fire-zone figure is drawn from it.
  • Not sorted: 13,451 permits (11.1%) list none of the six kinds of work, for example drywall and water-damage repairs, foundation repairs, stucco, fences and remodels of other rooms. They count in the totals.
  • Repeats and areas. Permits for the same kinds of work on the same parcel within 180 days count once. Truncated community plan area names are merged.
  • Declared valuation is not used. It is a fee figure, not a construction cost.

Download the Data

The processed dataset is published for reuse. Attribution to Blackbriar is welcome but not required. The underlying records are the City of Los Angeles'.

How Blackbriar Uses This

We build custom homes and take on major remodels in Los Angeles. On a remodel, the record helps at the start: it shows whether the scope is usually an Express Permit or plan check, how long plan check tends to take for that kind of work, and what owners in the same area are doing. Our process and services pages set out how we work, and you can talk to us directly.

FAQ

How many home remodel permits does Los Angeles issue each year?

The City of Los Angeles issued 19,273 alteration and repair permits on single-family houses in 2023, 19,989 in 2024 and 17,623 in 2025, after removing revisions, renewals, ADU work and repeat permits. From January 1 to October 31, 2026, it issued 15,817, 5.9% more than in the same months of 2025.

What is the most common home remodel permit in Los Angeles?

A re-roof. Re-roofs were 54.0% of remodel permits on single-family houses from January 1 to October 31, 2026: 8,546 permits, 23.4% more than a year earlier. Bathroom work appeared on 2,338 permits, windows or doors on 2,180, kitchens on 1,608 and seismic retrofits on 1,053. One permit can list several kinds of work.

How many kitchen remodel permits does Los Angeles issue?

1,608 permits on single-family houses included kitchen work from January 1 to October 31, 2026, the lowest of the seven years. 18.0% of them went through plan check, against 27.7% in 2023. The rest were Express Permits issued without plan review.

How long does a remodel permit take in Los Angeles?

Most need no plan review: 87.7% of remodel permits on single-family houses since 2023 were Express Permits, issued without it. For the 9,029 that went through plan check, the median from application to issue was 27 days, 28 for kitchen work and 23 for bathrooms. That clock includes time the application spends with the applicant.

Are seismic retrofit permits declining in Los Angeles?

Yes, in 2026. The City issued 1,053 seismic retrofit permits on single-family houses from January 1 to October 31, 2026, 36.8% fewer than in the same months of 2025 and the lowest of the seven years. More than 97% use the City's standard plan for bolting a house to its foundation. The permit record does not say why the number fell.

Where in Los Angeles are kitchen remodels most common?

As a share of remodel permits since 2023, kitchen work is most common in Bel Air – Beverly Crest (14.8%), Hollywood (14.2%) and Westwood (13.4%). It is least common in Wilmington – Harbor City (6.9%), where re-roofs make up 65.0% of remodel permits.

Where does this data come from?

From the City of Los Angeles open data portal, dataset pi9x-tg5x (Building and Safety permits issued from 2020 to present), with permits issued through November 21, 2026. Blackbriar removed revisions, renewals, ADU work and repeat permits, classified each permit by the work its description lists, and published the processed figures as CSV and JSON files.